Six raised beds, gravel paths, trellis, wild flower meadow and lawn

Autumn project in Summersdale, Chichester - 6 raised beds, gravel paths, water supply, wild flower meadow and free standing trellis for existing roses.  Site required removal of old sleepers, concrete paths, fruit cages, and trellis work - plus a load of buried rubble!  Fairly significant ground works required to ensure solid foundations for paths and beds.  Final turf laid in Jan '22.  Two fruit cages (2.5 x 3.5 m over lower beds) to follow in March. Turf finally down! Nearest lower 2 beds will have fruit cages over so wider paths around edges.