Autumn project in Summersdale, Chichester - 6 raised beds, gravel paths, water supply, wild flower meadow and free standing trellis for existing roses. Site required removal of old sleepers, concrete paths, fruit cages, and trellis work - plus a load of buried rubble! Fairly significant ground works required to ensure solid foundations for paths and beds. Final turf laid in Jan '22. Two fruit cages (2.5 x 3.5 m over lower beds) to follow in March. Turf finally down! Nearest lower 2 beds will have fruit cages over so wider paths around edges.